SEND US MESSAGE

Easy Erection Aluminum Shuttering Construction Forms System Slab Wall Panels Concrete Formwork
  • High Quality New Asia Aluminium Alloy Formwork for Villa Concrete Construction
Product Information

  High Quality New Asia Aluminium Alloy Formwork for Villa Concrete Construction


Material6061-T6 Aluminium Alloy
Main ComponentsBeam, Column, Wall, Staircase, Others: floors, slab...
Aluminum Formwork AccessoriesWedge, pin, tie rod, wing nut, washer, bolt, cone, waler stopper, form tie, coupler, clamp, pusher and so on.
Safe working load60KN/m2
Construction period3-5 days per storey 

High Quality New Asia Aluminium Alloy Formwork System for Concrete Villa ConstructionHigh Quality New Asia Aluminium Alloy Formwork System for Concrete Villa ConstructionHigh Quality New Asia Aluminium Alloy Formwork System for Concrete Villa ConstructionHigh Quality New Asia Aluminium Alloy Formwork System for Concrete Villa Construction

High Quality New Asia Aluminium Alloy Formwork System for Concrete Villa Construction

Advantages

Aluminium Formwork can be used widely in the construction of tall building, residential units and mass housing projects.

Light Weight

Made of aluminum alloy 6061-T6,it’s average weight is around 25kg/, easy to be carried manually

 

Flexible Operation

The system can be lifted by tower crane as a whole,or dismantled and installed by labors.It allows casting of wall, beam, slab and staircase monolithically or by two stages.

 

Long reusing life   

The panel is made of extrusion profiles which is high strength and not easy to be deformed or oxidated, the reusing time can reach up to 300 times.

 

Save labor cost

Panels are connected by pin&wedges, un-skilled labors can install and dismantle the system by hammers only.

 

Shorten construction period    

Early-stripping application improve the system cycle and save cost for users.After pouring of concrete, wall panels could be stripped in 12 hours and slab panels 24-36 hours, finish one floor by four days only.

 

Improvement of work environment

The system fabricated at factory and requires only installation at site keeps the work environment clean and safe. 


Project reference

High Quality New Asia Aluminium Alloy Formwork System for Concrete Villa Construction


Process Service

1. The extruded products will be cut into the right sizes.

2. Some products will be punched to make fastening holes.

3. Some products require additional welding works.

4. Check the products quality

5. Finalized products will be coated with release with release agent.

6. Completed the  pre-assembled before leaving the factory ,to make sure no mistakes.

High Quality New Asia Aluminium Alloy Formwork System for Concrete Villa Construction

   

 Packaging & Shipping