SEND US MESSAGE

Recyclable Moules De Construction Pour Beton Coffrage Metallique Aluminum Alloy Concrete Formwork for Swimming Pool
  • Light Weight 300 Reusable Times Easily Assembled Aluminum Concrete Formwork for Foundation Villa House Tall Building
Product Information

Introduction of 6061-T6 Aluminum Formwork System:

Material

6061-T6 Aluminium Alloy

Main Components

Beam, Column, Wall, Staircase, Others: floors, slab...

Aluminum Formwork Accessories

Wedge, pin, tie rod, wing nut, washer, bolt, cone, waler stopper, form tie, coupler, clamp, pusher and so on.

Safe working load

60KN/m2

Construction period

3-5 days per storey

Wall Panel Size

Length: 2300mm; 2450mm; Wideth: 300-600mm; or custom-made

Beam Panel Size

Length: 1500mm; Wideth: 100-400mm; or custom-made

Slab Panel SizeLength: 1200mm; Wideth: 200-600mm; or custom-made
Column Panel SizeLength: 3000mm; Wideth: 100-600mm; or custom-made 

Features

Lightweight

One-time Pouring

Cost-Effective

Resist moisture

Reused over 300 times

Recyclable

Environmental Friendly


Aluminium Formwork can be used widely in the construction of tall building, residential units and mass housing projects.

It is fast, simple, adaptable and cost effective.

It produces total quality work which requires minimum maintenance and when durability is the prime consideration.

Recyclable Moules De Construction Pour Beton Coffrage Metallique Aluminum Alloy Concrete Formwork for Swimming Pool

Recyclable Moules De Construction Pour Beton Coffrage Metallique Aluminum Alloy Concrete Formwork for Swimming Pool

Recyclable Moules De Construction Pour Beton Coffrage Metallique Aluminum Alloy Concrete Formwork for Swimming PoolRecyclable Moules De Construction Pour Beton Coffrage Metallique Aluminum Alloy Concrete Formwork for Swimming PoolRecyclable Moules De Construction Pour Beton Coffrage Metallique Aluminum Alloy Concrete Formwork for Swimming Pool

Recyclable Moules De Construction Pour Beton Coffrage Metallique Aluminum Alloy Concrete Formwork for Swimming Pool

Recyclable Moules De Construction Pour Beton Coffrage Metallique Aluminum Alloy Concrete Formwork for Swimming Pool

Production process

1. The extruded products will be cut into the right sizes.

2. Some products will be punched to make fastening holes.

3. Some products require additional welding works.

4. Check the products quality

5. Finalized products will be coated with release with release agent.

6. Completed the  pre-assembled before leaving the factory ,to make sure no mistakes.

Recyclable Moules De Construction Pour Beton Coffrage Metallique Aluminum Alloy Concrete Formwork for Swimming Pool

Project reference

Recyclable Moules De Construction Pour Beton Coffrage Metallique Aluminum Alloy Concrete Formwork for Swimming Pool


Packaging & Shipping